敘緻

Refined Narrative

  • Type | 單層
  • Style | 現代時尚
  • Location | 台灣新北
  • Area | 37坪
  • Member | 2大2小
  • Pattern | 2+1房2廳
  • Materials | 鐵件、大板磚、塗料、海島型木地板
莎若設計_敘緻平面圖
莎若設計_敘緻照片1
莎若設計_敘緻照片2
莎若設計_敘緻照片3
莎若設計_敘緻照片4
莎若設計_敘緻照片5
莎若設計_敘緻照片6
莎若設計_敘緻照片7
莎若設計_敘緻照片8
莎若設計_敘緻照片9
莎若設計_敘緻照片10
莎若設計_敘緻照片11
莎若設計_敘緻照片12

設.計.理.念.

DESIGN CONCEPT

落地窗篩入的天光,穿透紗簾在灰階塗料與深褐木紋間輕柔漫散,為俐落現代的空間暈染一層溫潤光暈;圓弧語彙自玄關蜿蜒而起,流經柱體、天花與樑線,將稜角化為柔和的視覺韻律,引領目光在開闊格局中自在遊走。孩子的笑聲迴盪於無隔閡的廳區,大人於光膜變幻的餐桌旁淺酌細語,簡約之中處處可見機能的細膩安排,日常皆能在通透的氛圍裡,覓得專屬的舒心步調。

因應業主對現代簡約的偏好,設計師以賽麗石、鐵件、大板磚與鍍鈦層疊深邃質感,營造俐落而富有個性的空間基調;考量家中兩位年幼孩子的活動需求,格局大膽由四房整併為二加一書房,釋放開闊動線讓孩童得以盡情奔跑;且塗料特選耐磨款、邊角導以圓弧,兼顧安全與美感,為一家四口打造視覺坪效倍增、悠然自得的柔潤居所。

Natural light streams through the floor-to-ceiling windows, gently illuminating gray-toned surfaces and deep wood textures while casting a warm glow across the contemporary interior. Flowing curved lines originate at the entryway and continue across columns, ceilings, and beams, softening rigid architectural edges and establishing a graceful visual rhythm that guides movement throughout the open-plan space. Within this airy environment, children’s laughter fills the shared living areas while adults gather around the light-filled dining space, enjoying moments of conversation and connection. Beneath its minimalist appearance, the design thoughtfully integrates everyday functionality, creating a home that supports a relaxed and comfortable pace of life.

Inspired by the homeowners’ preference for modern minimalist design, the project combines layers of Silestone, metalwork, large-format tiles, and titanium-plated accents to create a sophisticated material palette rich in depth and texture. To better accommodate the lifestyle of a family with two young children, the original four-bedroom layout was reconfigured into two bedrooms and a study, opening up generous communal spaces that allow for greater freedom of movement and interaction.

Safety and durability were also carefully considered throughout the design. Selected wear-resistant finishes for high-traffic areas and incorporated rounded corners and softened edges to reduce potential hazards without compromising the overall aesthetic. Through this balance of elegance, practicality, and family-centered planning, the residence becomes a bright, comfortable, and welcoming home tailored to the needs of modern family living.

TOP